Widening of Old Choa Chu Kang Road from Sungei Tengah Road to Lim Chu Kang Road (ER201)

Contract ER201 involves the widening of Old Choa Chu Kang Road from Sungei Tengah Road to Lim Chu Kang Road, from an undivided dual 1-lane carriageway to a 2-lane carriageway, eastbound; and a 3-lane carriageway, west bound. The project is scheduled to be completed within 36 calendar months from the date of commencement.


The contract involves the construction of a new carriageway; design and construction of 17 new reinforced concrete bus shelters; retrofitting of an existing reinforced concrete bus shelter opposite the Teen Challenge Dare Centre; provision for the relocation of 2 DBO bus shelters; provision of temporary covered link-ways to existing and temporary bus shelters where existing covered link-ways are affected; slope cutting and earth embankment works; design and construction of a vehicular bridge extension near Heng Soon Farm; design and construction of all structures including retaining structures, drains, culverts and sumps; design and construction of 3-cell box culvert extensions near the entrance of Tengah Airbase and near Cheng Tai Nursery; and design and construction of a vehicular structure connecting the existing 3-cell pipe culvert at Old Choa Chu Kang Road.

Project name Widening of Old Choa Chu Kang Road from Sungei Tengah Road to Lim Chu Kang Road (ER201)
Location Singapore
Completion Date 2014
Typology Infrastructure
Project Cost SGD 28,527,000.00
Client Or Kim Peow Contractors (Pte) Ltd